Congress canceled the MBT-70 in November and XM803 December 1971, and redistributed the funds to the new XM815, later renamed the XM1 Abrams after General Creighton Abrams. Prototypes were delivered in 1976 by Chrysler Defense and General Motors armed with the license-built version of the 105 mm Royal Ordnance L7 gun along with a Leopard 2 for comparison.

The actual development of the XM-1 was carried out on a competitive basis, contracts for it being awarded in 1973 to Chrysler and to General Motors. Both companies completed their prototypes in 1975 and after trials the Chrysler XM-1 was chosen in 1976 for further development on the grounds that it was being offered at a lower cost. The principal engineering difference between the two was that the General Motors prototype was powered by a variable compression ratio diesel, which was not entirely successful, while the Chrysler prototype was powered by a gas turbine, which was expensive to produce and which, in spite of repeated claims to the contrary, proved to have a high fuel consumption. A conventional diesel would have been a better choice for either of the two designs and one of 1500hp had been developed in Germany for the MBT-70 but it was not considered for the XM-1.

Whichever of the two US prototypes won, it was intended that it should be evaluated in competition with the German Leopard 2 with the view of achieving standardization between the US and German tank fleets, ostensibly even to the extent of adopting the same tank for both. In the event all that happened was that the US Army decided in 1978 to adopt the 120mm smooth-bore gun produced in Germany for the Leopard 2. The decision was taken after trials carried out in 1977 when the German 120mm smooth-bore gun was compared with the US 105mm tank gun, which by then was 18 years old, and a new 120mm rifled gun hastily developed in Britain to suit US requirements.

#

In the late 1970s, two companies, Chrysler and General Motors, had competing prototypes of the M-1. General Motors had a large and traditional diesel engine in the tank, and Chrysler, which had tried and failed to develop turbine engine technology for cars and trucks for the commercial market, wanted to recoup their costs and put a risky and complicated turbine engine in their tank. The Army was ready to give the contract to General Motors, but politics intervened. In 1987, the Washington Monthly laid out the scene around the all-important decision of what tank was to be chosen:

On a July afternoon ten years ago, Lt. Colonel George Mohrmann sat at his desk on Capital Hill awaiting a phone call. As head of the Army’s congressional liaison office, he was ready to deliver a stack of sealed letters to members of Congress announcing the winning contractor in the multi-billion dollar competition to build the Army’s M-1 tank.

The two competing contractors, Chrysler and General Motors, offered a clear choice. Chrysler had built its tank around a radically different and unproven tank engine, the turbine; GM had used a more conventional diesel engine. The two tanks had undergone months of head-to-head trials at Aberdeen Proving Ground in Maryland.

GM had won.

The Army, it seemed, was not going to risk adding the M-1 to its growing list of overly sophisticated weapons that cost too much and don’t work. “We were sitting there poised to deliver [the envelopes],” Mohrmann recalls. “The decision [to select GM] had been made. We were just waiting for the Secretary of Defense to be briefed.”

The call, however, was surprising. The Pentagon told Mohrmann not to deliver the letters. The next day, Defense Secretary Donald Rumsfeld ordered a whole new round of competition. A week later, Rumsfeld turned the M-1 tank program upside down. He mandated that the tank be redesigned to incorporate the turbine engine. Four months later the award-which promised to generate $20 billion in sales – went to Chrysler and the Army was on its way to getting a weapon suited more for a paved interstate than a battlefield.

… That isn’t another story about the Army’s incompetent bureaucracy. “You can blame the Army for a lot of things,” says Anthony Battista, a staff member of the House Armed Services Committee, “but not for the troubles of the M-1.” Rather, it’s a story of how outside factors can overwhelm military considerations in the Pentagon decision-making process, how narrow interests – in this case the ailing Chrysler Corporation and, by a strange twist, the U.S. Air Force – can outweigh the need for a reasonably-priced and effective military. The M-1 was never just a weapon; it was also a bail-out package.

Advertisements

4 thoughts on “General Motors XM-1

  1. Congratulations on delivering an obscured piece of history!
    I’Ve always appreciated that the M1 Abrams was the prodigal child of the U.S. Army – what with it seeing it’s MBT-70 and XM801 slipping through it’s fingers. But for the life of me, I was completely ignorant to the General Motors design being preferable to the U.S. Army!!

    I must say I’m amazed – no completely bewildered by the amount of programs like the XM1 program, by which American politics/Military Industrial Complex can interfere with what could be a ‘preferred/better design assessed by the principle service intending to operate it! Other examples that come to mind are:
    The TFX/F-111 program, where again and again the Boeing design was the referred option of both the USAF and USN…..

    Thank’s again

    Like

    • It stands to be said that the F-111 program produced an excellent plane with unrivaled capability at the time. They were loved by pilots, relatively reliable, and had seemingly endless abilities. In contrast, the M1 Abrams, while being very good, has always been a logistics and maintenance nightmare. AFBs are equipped for the kind of work an Abrams needs. Field Maintenance groups are not, and needed much different equipment from the get-go to service the M1. Any experienced grease monkey can service a diesel engine. It takes a freaking college graduate to work on a high RPM turbine.

      Like

      • It takes a freaking college graduate to work on a high RPM turbine

        Ha you obviously never served in Army…theres been 35+ years of kids straight out of high school that have worked on turbine engines in the M1 and for 70+ years on Jet engines in the US Air force.

        I’m really interested in where your sources are for all this bullshit.

        Like

  2. Pingback: M1 Tank Development | Weapons and Warfare

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.